Continuous line in a container for Ghana
Implemented installations
2014 - A continuous line installed in a
container that can be opened completely and shipped to the destination. The
customer had requested this installation, which is very special due to the way
in which it has been installed - completely inside a 20-foot container that can
be opened. This installation was shipped to Ghana for processing palm oil. The
installation is continuously moved from one village to another depending on the
demand and accumulated storage. Note that inside we have installed a milling
system, a 2000 kg malaxer, a 1500 kg/h decanter, an automatic-discharge
separator, a heating system with heat exchanger and pomace boiler, main
electrical panel and lastly a pomace discharge auger.